Services · ICT infrastructure

ICT infrastructure designed, tested, and documented as one coordinated scope

You need the cabling, the network, and the wireless to work as one system on the day you open, not as separate contracts that meet for the first time at commissioning. Our ICT infrastructure services cover structured cabling, network infrastructure, enterprise computing, and communication systems under a single point of responsibility. You get every link tested to TIA-568-D (2018) and ISO/IEC 11801:2017 before handover, with the as-built drawings, cable schedules, and test reports you need to run and expand the system yourself.

Every link tested toTIA-568-D (2018)ISO/IEC 11801:2017
Single point of responsibility

One contract, not four that meet at commissioning

Split the systems across vendors and the gaps between them become your problem on handover day. We hold the whole ICT scope: one number to call, one team that owns the result from design to certified handover.

The usual way3–4 separate contracts
Cabling
Network
Computing
Comms
versus
With YakkaservicesOne coordinated scope
Cabling
Network
Computing
Comms
Tested, documented, and handed over as one working system
What we deliver

Four systems, delivered as one scope

Most buildings buy these four separately and hope they meet. We design, install, test, and document them together, so they behave as a single system from day one.

Neatly dressed copper and fibre patch panels in a structured-cabling rack
01 / 04

Structured cabling

Copper and fibre backbone, horizontal cabling, patch panels and outlets, laid to a cable schedule and channel-tested to TIA-568-D before a single device is connected.

Cat 6A / OS2 fibrePatch panels & racksContainment & dressingLabelling & schedules
View structured cabling
How we deliver

Five phases, one continuous thread

The same team carries the work from first survey to signed-off documentation. Nothing is handed between contractors mid-project, so nothing falls through the gap.

Phase 01

Survey

We walk the site, capture existing conditions and confirm every route and rack position before any design work begins.

Phase 02

Design

One coordinated drawing set: every system on the same plan, interfaces resolved before installation.

Phase 03

Install

One crew, sequenced trades, containment first. No vendor waiting on another vendor, no rework when systems collide.

Phase 04

Test

Every link certified on calibrated instruments before handover.

TIA-568-DISO/IEC 11801
Phase 05

Document

As-builts, cable schedules, and full test reports, handed over so you can run and expand the system yourself.

One point of responsibility across all five phases, from the survey to the test reports you keep.
Tested & documented

Tested before handover. Documented so you can run it.

Commissioning is where most ICT projects quietly hand you a system nobody fully understands. We test every link to standard and give you the paperwork to operate and expand it without calling us back.

#DeliverableWhat you receive
01
Channel test reports
Every link certified on calibrated instruments, exported in full.TIA-568-D · ISO/IEC 11801
02
As-built drawings
Editable drawings of exactly what was installed and where: the reality, not the design intent.DWG / PDF
03
Cable schedules
Every outlet, run, and termination labelled and recorded, so future moves are a lookup, not an investigation.Labelled to ANSI/TIA-606
04
Warranty registration
Manufacturer warranty activated at certified handover and registered in your name.Up to 25-year system warranty

Start with an assessment, not a quote

Tell us what you are building. We will walk the site, scope the four systems together, and tell you plainly whether we are the right fit.

A certified engineer responds within one business day.